Posted: 17 Mar 2010 at 08:42 | IP Logged
|
|
|
The sequence is really up to you. I personally chose FAR-AUD-REG-BEC. FAR first because I wanted to get it out of the way before I start my rolling 18 months. BEC last because I wanted to save the easiest for last. (I'm fairly strong in those subjects)
I joined Becker at roughly the same time I sent in my application. Becker comes in about a week but then you don't receive your NTS for about a month and a half to two months. As a result, even though I received Becker, I didn't install it until a month before I received my NTS. That way I could study and sit for a test fairly soon after I received the NTS.
|